ADU/DADU Construction | Shoreline
What Shoreline ADU Construction Includes
- Site feasibility review on your Shoreline property
- Zoning and land use analysis
- Architectural floor plan development
- Engineering coordination
- Full permitting process management
- Foundation and structural construction
- Mechanical, electrical, and plumbing systems
- Interior buildout including kitchen and bathroom
- Final inspections and documentation
Shoreline Site Conditions That Shape the Project
Let’s Talk About Your Project
Attached ADUs and Backyard Cottages
Our Construction Process
Site and Zoning Confirmation
We start with a site visit to confirm setbacks, allowable square footage, height limits, and land use constraints. If environmentally critical areas are present, that review happens immediately.
Design and Permits
Our team develops the architectural floor plan and coordinates engineering. We manage the full permitting process with the city. Correction responses and permit revisions are handled by our team, not passed off to you.
Preconstruction Planning
Before building begins, we align scope, materials, schedule, and budget. You know exactly what's being built on your Shoreline property and how it will function long term.
Field Oversight
A dedicated superintendent manages daily construction activity. Inspections are scheduled in sequence. Structural framing, energy compliance, and life safety items are reviewed according to code.
This is not light backyard work. It is full residential construction. When you invest at this level, standards are enforced consistently throughout the building process.
Completion
Final permits are signed off. Documentation is organized. The ADU is delivered as a legal, inspected residence on your property.
Why Management Structure Matters in Shoreline
- One contract
- One accountable ADU builder
- One coordinated construction process